OSTWERK

drawing register - all sheets

a-200

Projects

Seven commissions, six built and one on site. Each one is filed here as the drawing it was designed in rather than the photograph it was finished as, because the section is the version that had to be true before anything was built.

1:1 how to read these

cut

anything the section plane passes through - walls, slabs, the ground

seen

beyond the cut - sills, treads, handrails, the far wall

set out

construction lines, existing fabric, sightlines, daylight

the point

one per drawing, and only ever the thing the section was cut to show

the copper rule is a house rule, not a standard - if a section needs two of them it means we have not finished deciding what the drawing is about

a-201 - a-207 register

Every commission, in order of issue

(6) built, 2019-2025   (1) on site

1:1 revision note

Six a year, and we are honest about which six

We take on six projects a year and no more, so the register is short on purpose. If your site is at the stage where a section would tell you something, that is the right moment to write.

Start a project