Brief
2–3 weeks · 10% of the fee
We visit, measure and write down what you actually need, what the site allows and what it will roughly cost.
- Measured survey of the site or building
- Written brief and area schedule
- Order-of-cost estimate
Questions at this stage
What does the £450 visit include?
Two hours on site, a measured sketch, and a written feasibility note inside three weeks. If you go ahead, the £450 comes off the brief-stage fee.
Do I need a measured survey?
For any existing building, yes. Every drawing that follows is set out from it, and a wrong survey is the most expensive mistake on a small job.