A document archive on a wharf, where the constraint was not the programme, the budget or the planners, but a groundwater level 2.1 m below the yard.

1:50 the section
long section - ground at ±0.00, archive floor at -3.40, water table in copper at -2.10

One copper stroke, as on every drawing in the register. Here it is the water table at -2.10.

1:20 what the drawing does not say

Paper wants 18 °C and 50% relative humidity, held steady. Steadiness is easier below ground than above it, because the earth is a flywheel. On this site it was also harder, because the water table sits at -2.10 and the archive needed 450 m² of storage at a level that put its floor at -3.40.

The building is a tanked concrete box, poured in one continuous sequence with no day joints below the water line, inside a secondary drained cavity that discharges to two pumped sumps. Above grade there is a light steel-framed reading room and office, which is the part visitors see and by far the smaller half of the problem.

The section is the drawing that got the building consented, because it is the only one that shows the water table and the archive floor on the same sheet. It hangs framed in the reading room, and the copper line on it is the water.

1:1 record
Site
Easting Reach
Client
Easting Reach Records
Programme
Archive store, reading room, two offices
Gross floor area
900 m², of which 450 m² below grade
Lowest floor
-3.40
Water table
-2.10, seasonal variation 0.4 m
Structure
Tanked in-situ concrete, steel frame over
Environment
18 °C, 50% RH, ±2% over a year
Completed
2019